AI Compute Deal Ledger · Free Dataset · CC BY 4.0

Lambda: The AI Deal Record

Every Lambda deal in the ledger, with the source on every row. Binding base-term value: none recorded, plus $35B announced but not binding. Snapshot disclosures (backlog restatements, order intake, program envelopes) are listed but never summed.

Binding value

·

0 binding deals, base terms

Binding capacity

·

contracted IT load with disclosed MW

Not binding

$35B

1 LOI / framework / reported

Deal by Deal

2026-08-31Reported↻ Circular

Lambda (Provider) · Anthropic (Buyer)

Value
$35B
Capacity / term
350 MW
First revenue
2027-01

Backfilled 2026-09-18 during the weekly ledger review, found alongside the Nscale row while researching Anthropic's reported $517B compute-commitment aggregate (that aggregate is not itself ledgered; it is a media rollup, not a company disclosure, and mostly restates deals already on the ledger). Second of Anthropic's two reported deals in the same week (the other being anthropic-nscale-monarch-2026-08); both stay separate rows since they name different providers, sites and figures.

Conditions: Reported cloud-compute agreement layered on top of the existing Hut 8 Beacon Point capacity (hut8-beacon-point-phase1-2026-05 / -phase2-2026-07, Nueces County, Texas): per Bloomberg's sourcing, Anthropic pays Lambda, Lambda installs Nvidia chips at roughly 350MW of the Beacon Point campus, and Nvidia (reported, unconfirmed, as the tenant behind the Hut 8 leases) sits above the arrangement as both chip supplier and underlying facility lessee, paying Hut 8's rent. This row records the Anthropic-to-Lambda commercial layer only; it is not an expansion_of the Hut 8 rows since it is a different contract, a different counterparty pair and a different dollar figure describing a different layer of the same physical capacity, and summing it with the Hut 8 rows would double count the underlying MW. Flagged circular given Nvidia's presence on multiple sides of the same capacity chain. Term length and GPU count were not disclosed in any report found. Initial energization expected Q1 2027. Neither Anthropic, Lambda nor Nvidia has confirmed the deal; held at status reported (excluded from binding aggregates) on two independent tier-1 reports.

Part of the free AI Compute Deal Ledger by Regards of Wallstreet, licensed CC BY 4.0. Cite it, chart it, link it.